Odies S, Y. and Cahyana, A. S. (2026) “Design of Preventive Maintenance Scheduling for Vacuum Feeder Line 4 Machine Using Microsoft Project Based on Pareto Analysis to Reduce Downtime: Perancangan Penjadwalan Preventive Maintenance Mesin Vacuum Feeder Line 4 Menggunakan MS Project Berdasarkan Analisis Pareto Untuk Mengurangi Downtime”, Indonesian Journal of Innovation Studies, 27(2), p. 10.21070/ijins.v27i2.2439. doi: 10.21070/ijins.v27i2.2439.