Risk Breakdown Structure Framework for Fast-Track Method Implementation in Traditional Market Revitalization Projects: Kerangka Struktur Perincian Risiko untuk Penerapan Metode Jalur Cepat pada Proyek Revitalisasi Pasar Tradisional. (2026). Indonesian Journal of Innovation Studies, 27(4), 10.21070/ijins.v27i4.2311. https://doi.org/10.21070/ijins.v27i4.2311