Rohmatdhoni, S., and B. I. Putra. “PERT Scheduling Reduces Project Time and Cost: Penjadwalan PERT Memperpendek Waktu Dan Mengurangi Biaya Proyek”. Indonesian Journal of Innovation Studies, vol. 26, no. 4, Apr. 2026, p. 10.21070/ijins.v26i4.2112, doi:10.21070/ijins.v26i4.2112.