Prambudi, W. T., N. Riwibowo, F. S. Cahyaningrum, M. Ariyanti, and M. A. Rizki. “Time Delay Risk Analysis in SMPN 2 Mantup Classroom Construction: Analisis Risiko Penundaan Waktu Dalam Konstruksi Ruang Kelas SMPN 2 Mantup”. Indonesian Journal of Innovation Studies, vol. 26, no. 4, Sept. 2025, p. 10.21070/ijins.v26i4.1752, doi:10.21070/ijins.v26i4.1752.