[1]
S. Rohmatdhoni and B. I. Putra, “PERT Scheduling Reduces Project Time and Cost: Penjadwalan PERT Memperpendek Waktu dan Mengurangi Biaya Proyek”, ijins, vol. 26, no. 4, p. 10.21070/ijins.v26i4.2112, Apr. 2026.