[1]
W. T. Prambudi, N. Riwibowo, F. S. Cahyaningrum, M. Ariyanti, and M. A. Rizki, “Time Delay Risk Analysis in SMPN 2 Mantup Classroom Construction: Analisis Risiko Penundaan Waktu dalam Konstruksi Ruang Kelas SMPN 2 Mantup”, ijins, vol. 26, no. 4, p. 10.21070/ijins.v26i4.1752, Sep. 2025.