Rohmatdhoni, S. and Putra, B. I. (2026) “PERT Scheduling Reduces Project Time and Cost: Penjadwalan PERT Memperpendek Waktu dan Mengurangi Biaya Proyek”, Indonesian Journal of Innovation Studies, 26(4), p. 10.21070/ijins.v26i4.2112. doi: 10.21070/ijins.v26i4.2112.