Rohmatdhoni, S., & Putra, B. I. (2026). PERT Scheduling Reduces Project Time and Cost: Penjadwalan PERT Memperpendek Waktu dan Mengurangi Biaya Proyek. Indonesian Journal of Innovation Studies, 26(4), 10.21070/ijins.v26i4.2112. https://doi.org/10.21070/ijins.v26i4.2112