[1]
Prambudi, W.T., N. Riwibowo, Cahyaningrum, F.S., Ariyanti, M. and Rizki, M.A. 2025. Time Delay Risk Analysis in SMPN 2 Mantup Classroom Construction: Analisis Risiko Penundaan Waktu dalam Konstruksi Ruang Kelas SMPN 2 Mantup. Indonesian Journal of Innovation Studies. 26, 4 (Sep. 2025), 10.21070/ijins.v26i4.1752. DOI:https://doi.org/10.21070/ijins.v26i4.1752.